4/12 to 4/16

The house is coming along as planned. We are still on track as far as we see to move in when planned. 
In the last few days the walls for the bedroom, closet, bathroom and door jams were all done. The rough plumbing has been finished and our bedroom sliding glass door has been installed. The stairs are going in today, I can't wait to see them when I get off work. 
We finally decided to put our washer/dryer upstairs along with the hot water heater. We will put up a wall to block them off from the rest of the room since that area will be guest room/sewing room for me.
Picture

My bedroom sliding glass door is done, it was going to be special ordered due to the size and our framer Andy found the exact size we needed at Home Depot from someone else that had special order they never picked up. So we got lucky! It even has blinds in between the panes of glass, just like we wanted.

Picture

This is my bedroom closet. We will pick out doors for it tonight.

Picture

This is my walk in shower. The hole in the floor is just a crawl space it will be boarded up and tile will go over it. The rough plumbing is also in for the shower.

Picture

Bathroom vanity rough plumbing is in! The pipe going up I believe is to the washer and dryer area upstairs.