As of the last time I posted ~ Drywall is Up ~ we now have texture on the drywall, all layers of paint up including 2 layers of sprayed on primer and 2 layers of the colors we choose. ALL plugs, switches, cam lights, bathroom fan & all light sockets inside the house done. Floors sanded but no stain as of right now on them and I think that is all, oh wait one new door know, lol. It's soon to be done. Carpet for the bedroom, stairs and upstairs is measured and tomorrow will be ordered along with blinds, they came today to measure them. Shower will be started Wednesday, floors will be stained this week and kitchen cabinets will go in this week ( I hope).
Pictures are in no order, just showing you all that is done to this point.
Kitchen ~ Painted Sea Salt, under stairs area (will be a desk) painted Lemon Grass and all kitchen plugs, switches and cam lights up
|
Desk area again
|
Front Door wall painted in the Sea Salt color as an accent wall & all the plugs and switches done here too, plus the wiring for the ceiling fan we still haven't put up.
|
Bedroom walls again Sea Salt and I forgot what the accent wall color is but it's a green shade. We tried to stick with what we thought is a beach shades.
|
My boyfriend getting ready to paint the primer, such a messy paint little bits were ALL over him, me, sprayer and everything that wasn't covered up when he got done.
|
After painting the primer with the sprayer
|
Sanding Floors
|
I think this is after 2-3 times going over the floor with the sander
|
After 2 days of sanding. It was a LONG process to get the floors smooth, we shall see what staining them looks like in the next few days.
|
|